Swept Path Analysis
Planning Applications for temporary road works / new road layouts sometimes need to demonstrate that the plan layout can accommodate the movement of vehicles. Designs are being challenged more and more by the planning authority who need to be confident that the proposed layout is fit for purpose, particularly for sites where room for vehicle manoeuvres is limited.
For the Local Authority to be confident that the design proposals can accommodate vehicle movements they can request a drawing showing the Swept Path Analysis of vehicles overlaid on the proposed site layout to demonstrate that the vehicles can manoeuvre safely and efficiently within the site layout. We use the latest Vehicle Tracking software to show vehicle swept path analysis using large vehicles including 16.5m (length) HGV.